Acclimatising laminate floor.
Preparing concrete floor for laminate wood flooring.
A container for solution.
To prepare the foundation concrete floor for laying laminate you will need.
The two most common formats are vinyl plank flooring and vinyl tile.
Before you begin the actual installation of your new laminate floor you have to prep the existi ng floor.
If you re looking for an easy to install floor covering for a concrete subfloor that will resist wear and look great longer than practically any other flooring material consider vinyl flooring.
Inspect the moisture level check the moisture level of the subflooring using a moisture meter.
This article is about how to prepare the floor before installing laminate flooring laminate flooring is one of the best materials to use by homeowners when deciding to make a home improvement.
First off the subfloor should be flat.
Check your wood flooring manufacturer s recommendations and sand any high spots with a concrete grinder.
If you poured your subfloor recently make sure you get an accurate reading on the moisture level prior to installation.
Some more floor preparation scraping and sweeping.
If it s made of concrete grind off any high spots.
After i finish with removing the carpet tackstrip and padding i check the floor for any lumps of drywall mud or concrete lumps.
Floor preparation can be pretty time consuming hopefully there won t be any surprises that make this task any longer.
Once you ve confirmed that you have a suitable laminate flooring subfloor you will need to prepare your subfloor for installation.
Place a piece of underlay on the concrete sub floor and a laminate board on top.
As a rule new concrete must cure for 60 days before you can install laminate vinyl or hardwood flooring on top.
A floating floor laminate or locking hardwood shouldn t be installed over a wood subfloor that s adhered to a concrete slab.
To determine the roughness of the concrete floor we put a direct rail to the floor and a level is determined at any not very smooth place.
Whether you have a plywood subfloor or a concrete subfloor there are a few steps that are universal in preparing the subfloor.
The low price the large variety of colors and textures high quality durability and easy maintenance make laminate flooring a great choice.
Low spots should be filled with leveling compound.
If you like the look of hardwood you should narrow your search to plank flooring.
Typically the floor must be level and uniform within 3 16 inch every 10 feet.
Concrete can often times hold moisture for longer than other types of floors due to its porous composition.
The most important step in this process is checking for any damages.
I use my scraper and scrap everywhere.
A plastic roller with spikes.
Use a long level and tape measure to check that the floor is level.